Cables in scope — — m design length
Issued for construction — —% of scope
Pulled cables — —% of scope
Pulled metres (design) — —% of scope metres · — m cut from drums
Terminated — —% of scope · — tested
Pulled, last 7 days — m · — cables · — m still to pull

Status funnel

Cables that have reached each stage or beyond. A stage is read from the latest execution date on the cable (RI, IFC, Pulled, Terminated, Tested).

—

Pulling S-curve — actual vs plan (metres)

Cumulative design metres pulled per day against the straight-line plan from each team's plan start to its required finish date (Targets section below).

—

Weekly scorecard — team targets vs actual

Weeks run Sunday to Saturday. Pulling counts cables with a pulled date in the week; termination counts cables with a connected date in the week. Targets are the weekly rates implied by the required finish dates; variance is actual minus target.

Team Target m Pulled m Var. m % of target Target cables Pulled cables Var. Term. target Terminated

Weekly pulled metres vs target

—

Required finish dates and the weekly targets they imply

The saved finish dates per team are in targets.csv in the repository. Typing a date above recalculates everything on this page for you only; to change the plan for everyone, edit that file. Weekly target = work remaining at the plan start ÷ weeks to the finish. "Required now" = what is still left ÷ weeks left from this week. "vs plan" = metres pulled to date minus what the straight-line plan expected by today.

Team To pull To pull m Pulling finish Weeks left Target m/wk Target cables/wk Required now m/wk vs plan (m) To terminate Termination finish Term. target/wk Required now/wk

Progress by destination building

Cables grouped by the building of the destination equipment.

—

Engineering status by cable owner

Owner is the engineer who holds the cable in the cable list. "Not IFC" cables still need design or routing.

Owner Cables IFC Not IFC Pulled Terminated

Cable list

Showing — of — matching cables (first 150 by tag). Narrow the filters or search to see the rest.

Tag Team Unit Type / size From To Dest. bldg Route Design m Pulled m Status Stage IFC Pulled Terminated Owner
Definitions and assumptions
  • Scope: every cable in the list except status Del (deleted). Metres are design lengths from the cable list; "cut from drums" is the actual pulled length.
  • Stage is read from dates, not from the status code: Tested (T Date) › Terminated (C Date) › Pulled (P Date) › IFC (IFC Date) › Routed (RI Date) › Design.
  • Status codes as exported: IFE = issued for execution (ready to pull), IFT = issued for termination (pulled), P = pulled, C = connected / terminated, D = design, UD = under design, Del = deleted.
  • Team is the cable list's "List" column (LV, MV, Control, I&C, FO, Substation). Cables with no list were assigned by cable family.
  • Targets come from a required finish date per team and stage (targets.csv). The weekly target is the work remaining at the plan start spread evenly to that date; the starting dates are placeholders (pulling 14 Jan 2027, termination 28 Jan 2027) — replace them with the required dates.
  • Weeks start on Sunday. "Last 7 days" counts from the day the dashboard is opened.